-
Notifications
You must be signed in to change notification settings - Fork 0
/
input2.txt
41 lines (41 loc) · 855 Bytes
/
input2.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
1
Project Risk Estimation
The problem is to estimate the risk level of a project based on the project
funding and the technical experience of the project’s team members.
1
dirt IN [0,100]
fabric IN [0,60]
Wash_time OUT [0,100]
x
2
dirt
small TRAP 0 0 20 40
medium TRAP 20 40 60 80
large TRAP 60 80 100 100
x
2
fabric
soft TRAP 0 0 20 40
ordinary TRAP 20 40 60 80
stiff TRAP 60 80 100 100
x
2
Wash_time
v_small TRI 0 0 15
small TRI 0 15 30
standard TRI 15 30 45
large TRI 30 45 60
v_large TRI 45 60 60
x
3
dirt small and fabric soft => Wash_time v_small
dirt medium and fabric ordinary => Wash_time standard
dirt small and_not fabric soft or dirt medium and fabric soft => Wash_time small
dirt medium and fabric stiff => Wash_time large
dirt large and_not fabric soft => Wash_time v_large
dirt large and fabric soft => Wash_time standard
x
4
60
25
Close